Pile Level Correction
16/04/26

Description of Works:

  • Pile trimming to correct levels using Stihl sawing methods.
  • Works planned and sequenced to minimise duration and overall disturbance.
  • A gravity-fed water suppression system will be deployed throughout to control dust emissions.
  • Noise monitoring will continue in line with the Best Practicable Means (BPM) as defined under BS 5228.