Existing Footpath (FP1) Closure
22/04/26

As the on-site access between the two fields crosses the existing footpath, it is necessary to close FP1 for health and safety reasons. The permissive path will be available for public use during this time to maintain access and reduce disruption to residents.

The closure dates are will be between the 6th May and 8th November 2026.

These measures are in place to prevent and mitigate any risk of accidents during the construction works.

We apologise for any inconvenience caused and thank you for your understanding.

Related posts